TH-ID 2005
|
The Ichnography Layout System is developed by the Tsinghua Sware Software Hi-Tech Co., Ltd independently. It adopts efficient sketch engine, friendly customer interface, simple and convenient operation method, request less for the operators' computer knowledge, fast diagram output meet to the characteristics and requests of the ichnography layout. It is the ideal tool of biding that preparation time short but the text file request very high, and of construction ichnography layout in high-level organized firms.
|
|
|
|
TH-PM 2005
|
This system apply network plan and excellently turn technique in the actual management on the base of drawing domestic and international of the same kind software's advantages, adopting swim-lane chart double-codes time mark network diagram as the main tools of project schedule management and control by linking with every kind of engineering ration, realizing not only accurate calculation and analysis on project resource and cost through controlling time limit for a project, cost macroscopically, but also moderate the concrete usage of the manpower, equipments, material from the tiny view.
|
|
|
|
TH-3DA 2005
|
This is the first visualized construction project estimation system developed on the AutoCAD platform in China. It realises the direct transformation of electronic file from architecture design to graphic components, which are then used in project estimation and pricing. This software was certified by the Chinese Ministry of Construction in August of 2000 and was listed in the Guidance for Scientific and Technological Achievement Utilization 2002 published by the Chinese Ministry of Construction.
|
|
|
|
TH-CM 2005
|
This system is one of the current management software in the construction industry, can manage the enterprise's contracts scientifically and standardized, improving the contract management efficiency and quality, and supply information for spot implement, engineering gathering, engineering payment and engineering claim for compensation.
|
|
|
|
TH-BQ 2006
|
National standards [GB50500-2003] put into implement from 1, Jul, 2003. To catch with the new criterion, GCPCAS2003 developed by THSWARE issued at 1,Jul,2003, and passed the accreditation of Ministry of Construction, People's Republic of China, and the accreditation of Project Cost Management office in Guangdong and Shenzhen.
This product is designed according to the standard of GB50500-2003. The development guidelines are "practicality, easy manipulates currency". Feeling together with the Project Cost Analysis System development experience of Shenzhen, Guangdong, Hunan, Chongqing etc. The Project Cost system based on currency platform can link many sets of standards and norms, realizing multi-cost analysis. It can also offer re...
|
|
|
|
|